Background documentationOEE Standard Definition Locate this document in the navigation structure

 

You use this activity to define standard cycle times and overall equipment effectiveness (OEE) targets for a unique resource-material-routing step combination to allow definition of an accurate production rate when resources process different materials at different rates.

Prerequisites

You have defined materials, resources, and operations in SAP ME.

Fields

The following table describes fields requiring explanation:

Field

Description

Definition Type

A filter:

OEE Target (%): Desired or planned OEE for the resource. A value against which the calculated OEE is compared visually in the OEE Report (see OEE Report)

Standard Cycle Time: Planned tact time for the resource-material-routing step combination, used to calculate the theoretical time to produce a material