Choose
Enter the order number.
Choose ( ) .
The document overview appears.
Make the changes.
Choose ( ) .
Note
If the changed link was generated from master data, the change must be confirmed (confirmation prompt).
( )
Changes of operation numbers are copied into the document links.
( )
When sequences are changed, the links assigned to an operation that is to be changed are reassigned to the order header.