Show TOC

 Changing Document Links Locate this document in the navigation structure

  1. Choose   Logistics   Production   Shop floor control   Order   Change   .  

  2. Enter the order number.

  3. Choose  ( ) .

  4. The document overview appears.

  5. Make the changes.

  6. Choose  ( ) .

Note Note

If the changed link was generated from master data, the change must be confirmed (confirmation prompt).

 ( )

Changes of operation numbers are copied into the document links.

 ( )

When sequences are changed, the links assigned to an operation that is to be changed are reassigned to the order header.

End of the note.