You can assign a reduction strategy to each operation in the interoperation times section of the Operation Details screen. This strategy specifies
how many reduction levels may be applied to an operation (maximum of six levels)
which reduction measures are carried out at the individual levels
You can set reduction strategies in Customizing for routings under Operation Data .