 Information in the Routing Header Locate this document in the navigation structure

Usage

The following data in the header of the routing is relevant to costing.

  • Task list type

  • Task list group

  • Usage

  • From lot size / to lot size

  • Change number

  • Validity period

You check this data by choosing   Details   Header   .  

Features

Task list type

You can select the following task list types for material costing:

  • Routings

  • Rate routings

  • Recipes

You specify the task list type when creating the routing. You can enter a default task list type in the costing view of the material master record.

Task list group

The routing group combines similar routings.

You enter the routing group in the initial screen of the routing. If you do not enter a routing group, the system assigns a group automatically.

You can enter a default routing group in the costing view of the material master record.

Group counter

The group counter identifies a routing within a routing group. The system sets the group counter automatically.

You can enter this value as a default in the costing view of the material master record.

Usage

The usage indicates what the routing is used for (such as production or repair). Together with the task list type and the status of the routing, the usage forms a search criterion for automatic alternative determination.

Status

The status of the routing specifies whether the routing is, for example, released or still being processed. Routings can only be costed without errors if their status allows costing. Together with the task list type and the usage of the routing, the status constitutes a search criterion for automatic alternative determination.

From lot size / to lot size

If different lot size ranges are represented by different alternative routings, you select the routing for costing by means of the costing lot size.

Change number

All changes to the routing that are made with a change number are included in costing.

You enter a change number in the initial screen of the routing.

Validity period

The routing must be valid on the quantity structure date of the cost estimate. You enter a key date in the initial screen of the routing.