 Sub-calculations Locate this document in the navigation structure

In the operation or sub-operation of a routing the standard values calculation can take place in several individual steps: the sub-calculations . For example, that may be necessary if a standard value is made up of several time segments (such as, setup time, primary processing time and secondary processing time).

Every sub-calculation is the result of a method calculation. If several sub-calculations exist, this may be because one and the same method has been calculated several times or because several different methods have been calculated. If only one method is evaluated in a standard values calculation, then the system only creates one sub-calculation.

Note Note

If the same value type was calculated in several sub-calculations, then the calculated values of these sub-calculations are added and transferred to the relevant standard value field.