Show TOC

 Detailed Reports for Materials Locate this document in the navigation structure

Definition

Reports based on the data of the existing material cost estimates in the system

Use

In the selection screen, you can directly enter the cost estimate data for the report you are calling up or search for it with  ( ) Cost Estimate .

Before calling up the report, you can make a number of settings (some of which you can change in the report) in the selection screen :

  • You can specify which cost base and which cost component view (for example, cost of goods sold) should be displayed in the report. If you don’t enter a cost base, the costs are displayed based on the costing lot size.

  • You can display the costs in company code or controlling area currency (if the data exists; see Currencies in Costing ). To do so, choose   Settings   Currency...  

  • You can select a predefined layout with  ( ) .

If you want to have multiple low-level codes displayed in the itemization, choose   Settings   BOM Explosion.   You can also specify that only material items should be displayed. You can have an additional field   Level displayed that shows the low-level codes of the respective report lines.

See also: