Online:
Choose
The Delete Costing Run screen appears.
Enter the name and date of the costing run.
Do not set the Background processing indicator.
Choose ( ) .
Data is displayed on the costing run that is to be deleted.
Choose ( ) to delete the costing run.
In the Background:
Choose
Enter the name and date of the costing run.
Set the Background processing indicator.
Choose ( ) .
The system displays the dialog box Background Processing Job Parameters. You use this box to make the settings for background processing.
Check the job name proposed by the system and change it, if required.
Set the indicator Immediate start or enter the date from which the job should be started. The following options are available:
Date/time to enter an exact date
After job or After event , if the job should only be started after another job has ended or after a particular event
Choose ( ) Confirm .
Choose Background Processing .
to display all jobs. For more information, seeIf you delete a costing run, the data for |
|
Selection |
is deleted |
Structure explosion |
is deleted |
Cost estimate |
is not deleted |
Marking |
is not deleted |
Release |
is not deleted |
The administrative data for the costing run (name, description, selection and structure explosion) is deleted. The material cost estimates themselves are not deleted. You have to delete them in a second step. For further information, see Deleting Material Cost Estimates .