Show TOC

  Display of Materials to Be Costed Locate this document in the navigation structure

Use

This report gives you a quick overview of the materials being costed. The report is mainly used for the generation of extracts that can be displayed in a MiniApp in the workplace.

Features

The report displays the following materials:

  • Materials that can be costed (the No Costing indicator is not set in the costing view of the material master)

  • Materials for which no marked or released standard cost estimates exist in the system

Activities

If you set the Sorted by Earliest Plan Order indicator in the selection screen, the dates of the orders for all materials to be costed for which a plan order exists (POrd) are sorted and displayed in the order start date column. If you do not set the indicator, performance during execution of the report is improved.

If you do not want to save the extract, you do not have to enter a user. If you save the extract without entering a user, all users can display the extract.

Under Maximum no. of hits, enter the maximum number of materials that should be displayed in the list. Limiting the number of hits improves performance.

Integration

The extract that you save here is displayed in the MiniApp. The report SAPRCKAPP02 allows you to see the contents of the extract in the system.

Note for System Administration:

To display the extract in the MiniApp, you must carry out the steps described under Setting Up MiniApps .