 Assigning Production Resources/Tools to Operations Locate this document in the navigation structure

Prerequisites

A master record must have been created in the system for a production resources/tool (PRT). Depending on the PRT category, the following additional requirements must be met:

  • Materials, equipment, and documents must have been released for use as production resources/tools via their status

  • Production resources/tools with a PRT-specific master record (miscellaneous) must have been released for resource planning via their status

  • Production resources/tools with a material master record, a PRT-specific master record, or an equipment master record must have been defined for routings via their task list usage.

Procedure

  1. On the operation overview of the routing, select the operation to which you want to assign production resources/tools.

  2. Choose   Goto   Production resources/tools.  

  • If PRTs have already been assigned to the operation, the PRT overview of this operation appears.

Choose   Edit   New entries   and the category of the PRT you want to assign.

  • If no PRTs have been assigned to the operation, the dialog box for production resources/tools of the category Material appears.

If you want to assign a different PRT category, choose the corresponding function key.

  1. Enter the PRT key as well as the item number and the basic data for PRT assignment and choose Continue .

  2. If you want to assign more production resources/tools, choose   Edit   New entries   and the PRT category you want to assign. Then repeat step 3.

  3. If you have finished assigning production resources/tools, choose Back .

  4. Select the assigned PRTs on the PRT overview and enter additional data for the assignment as required:

  • To enter standard values, choose   Details   Prod.resource/tool   General view.  

  • To enter usage dates, choose   Details   Prod.resource/tool   Dates.  

  • To enter a long text, choose   Goto   Long text   .