 Assigning Templates for Cost Objects and Calculations Locate this document in the navigation structure

Use

Because templates for cost objects are dependent on materials and orders, the SAP System must select the appropriate template at the time of the valuation event. Template selection is based on the following assignment logic:

The SAP System selects the template based on the overhead structure, the distribution key, and the environment.

  • When planning product costs, the SAP system uses the overhead structure based on the valuation variant, itself selected based on the costing variant. The distribution keys are selected through the overhead cost group in the master data of the material to be costed. The SAP System selects the environment based on the costing method (direct or product costing).

  • When costing cost objects and allocating to cost objects, the SAP System uses the overhead structure and distribution key taken from the master data of the cost object. The environment is also selected based on the cost object.

Procedure

  1. In the Implementation Guide (IMG) of Activity-Based Costing, choose   Templates   Assigning templates for cost objects and calculations,or in the menu for Activity-Based Costing Period-end closing   Current settings   Assign templates to cost objects  

  2. Enter the controlling area, costing sheet, overhead key and environment, and then the template to be applied.

  3. Save your entries.

    Note Note

    The costing sheet must always be entered. Without a costing sheet, the template is not pulled and costs are not calculated.

    End of the note.

    This graphic is explained in the accompanying text.

     

This graphic is explained in the accompanying text.

 Assigning Templates - Cost Objects

Note Note

Only one template will be called up for each environment.

End of the note.