Show TOC

Background documentationOpen Data Collections Check Locate this document in the navigation structure

 

You can use the DC520 hook point activity to check for all operations on the routing, up to and including the current operation, to ensure that the required data parameters for all associated DC groups have been collected for the current SFC number(s).

This activity is used with the PRE_COMPLETE hook point for an operation or resource.

More Information

Data Collection (DC)