Show TOC

 CAPP Standard Values Calculation in the SAP System Locate this document in the navigation structure

The calculation of standard values with CAPP belongs, like the material master, BOMs and routings, to the master data in the Production Planning System (PP).

The PP system has interfaces to:

  • Materials Management (MM)

  • Controlling (CO)

  • Personnel Planning and Development (PD)

All modules are real-time applications. This means that all quantities and values are saved directly and the same current data is available to all users of the system.