You can make the following settings for decoupling:
Execution Time
You summarize the following settings in a key term for process control:
Which processes should be decoupled (automatic goods receipt, backflushing, actual costs determination)?
When should the processes run (online, update task, background task)?
To define the control key for process control choose
in Customizing for Shop Floor Control.Confirmation Parameters
You assign an order type and plant to a key term for process control. This activates decoupling for the order type.
To maintain the confirmation parameters in Customizing for Shop Floor Control, choose
.Parallel Processing
If you are working with background jobs, you enter the confirmation processes that should be processed in parallel here.
The confirmation processes for goods movement and actual cost determination differ. For each of these groups you can determine the following parameters:
number of parallel tasks
which server
maximum number of items per material document (for goods movements)
To define the settings for parallel processing, choose
in Customizing for Shop Floor Control.