Show TOC

 Assigning PRT wear counters to Production Resources/ Locate this document in the navigation structure

Prerequisites

The production resource/tool (PRT) has an equipment master record.

The PRT wear counter exists in the system.

Procedure

  1. Choose   Logistics   Production   Master data   Production resources/tools   and then   Production resources/tools   Equipment   Change   .

  2. Enter the data on the initial screen and choose Enter .

  3. Choose PRT data.

  4. Enter the counter in the MeasPoint field.

  5. Save the data.