Show TOC

 Settling an Order Locate this document in the navigation structure

  1. Choose   Logistics   Production   Shop floor control   Period-end closing   Settlement   Individual processing.  

  2. Enter the number of the production order that you wish to settle.

  3. Enter at least the following data:

  • settlement period

  • fiscal year

You can also enter the following data:

- processing type

- posting period

- asset value date

  1. At this point, you can decide whether to carry out the settlement as a simulation or as an update :

  • If you do not set the indicator Test run , the results of settlement are updated.

  • If you do set the indicator, settlement is simulated. By simulating settlement, you can check, for example, the completeness and correctness of the objects to be settled.

  1. Choose  ( ) .

Note Note

You can settle a production order any number of times.

End of the note.