After you have executed a material cost estimate, you can analyze the costing results. The material cost estimate gives you the following information:
Cost Component Split
Itemization
Itemizations by Cost Element
Costed Multilevel BOMs
Partner Cost Component Splits
See also:
Reports in Product Cost Planning
Analyzing the Results
Displaying Material Cost Estimates and Analyzing the Costing Run
Saving Material Cost Estimates
Logs in Material Costing
Costing Status