Show TOC

 Assigning Capacity Requirements Locate this document in the navigation structure

Prerequisites

You can only assign capacity requirements in the production order, if you have already defined individual capacities in the corresponding work center.

Procedure

  1. Call up the operation overview in the production order.

  2. Select the relevant operation and choose  ( ) .

  3. Choose the tab page Assignment of reqmts.

  4. Choose the capacity category for which you want to assign the requirements:

  • with the machine assignment you specify the description of the relevant machine.

  • when assigning personnel you specify the name of the relevant employee.

  1. Enter the split quantity for each individual capacity.

  2. If necessary adjust the standard values.

  3. Save your entries.