Show TOC

 Changing the Cost Estimate Without Quantity Structure Locate this document in the navigation structure

  1. Choose   Accounting   Controlling   Product Cost Controlling   Product Cost Planning   Material Costing   Cost Estimate Without Quantity Structure   Change.  

  2. The screen Change Material Cost Estimate Without Quantity Structure appears.

  3. Enter the material and plant.

  4. In the Costing data tab page, enter the selection criteria for the cost estimate to be changed ( Costing variant , Costing version , Valid on ).

  5.  ( )

    Choose  ( ) Cost ests to search for the material cost estimate without quantity structure. The dialog box Selection of material cost estimates - w/o qty struct appears. Enter the selection criteria and choose  ( ) . The system displays a list of the cost estimates found. You can transfer the desired cost estimate from the list by double-clicking on it.

  6. Choose  ( ) .

  7. The list screen of the unit cost estimate appears.

  8. Edit the costing items.

  9. You can also use the detail screen for this. Place the cursor on the desired costing item, and choose  ( ) .

  10. Choose  ( ) and check the header information.

  11. Choose  ( ) to save the costing items.

  12. When you save, the overhead is calculated. The costing items are saved temporarily. You return to the screen Change Material Cost Estimate Without Quantity Structure .

  13. Choose  ( ) to save the material cost estimate without quantity structure.

See also: