If a material is managed in batches, you can carry out a batch split for every component.
This means that if you split a batch, you assign more than one batch to one component. In this case, each batch is displayed as a separate component in the component overview.
Note
Batch splits can only be triggered manually in the production order.
The following requirements must be met for batch splitting:
The material master record of the material must specify that the material is managed in batches
Batches must exist for the material