Show TOC

 Automatic Update of Material Master Records Locate this document in the navigation structure

Use

You use this function to update the material master records automatically. This is particularly useful, if you have a large number of records to update.

Integration

In case there are several routings for a material, the system has to determine which routing is to be scheduled. To do so, it uses the priority rules that you have specified in Customizing by choosing   Production   Capacity requirements planning   Operations   Scheduling   Define scheduling parameters for production orders.  

You can use report program RCPMAU01 to update automatically in the background.

Features

There are various criteria for selecting the materials whose master records you want to update.