Show TOC

 Releasing an Operation Locate this document in the navigation structure

Prerequisites

You have to go to Production Order Maintenance .

Procedure

  1. Choose  ( ) .

  2. Select the operations that you want to release.

  3. Choose   Operation   Release   . The system releases the selected operations.