Background documentationAdjust Production End Time Locate this document in the navigation structure

 

You use the ADJUST_PROD_COMPLETE hook point activity to correct the operator’s productive time by adjusting the complete time by a fixed amount. This allows you to account for delays in sending the complete message from an automated production machine.

This activity is used with the PRE_COMPLETE hook point.

Rules

The following table describes rules and settings that you can change for this activity in Activity Maintenance:

Rule

Setting

UNLOAD_TIME_PER_SFC

Specifies the adjustment to the unloading time per SFC number in seconds