Show TOC

 Results of Reference and Simulation Costing Locate this document in the navigation structure

Use

You can use base planning objects as a reference when costing other objects. For further information, see Reference and Simulation Costing .

You can display and analyze the results of Reference and Simulation Costing in the Product Cost Controlling Information System .

See also: