Changes have been made to the routing.
Choose
The screen Creation of Preliminary Cost Estimates for Product Cost Collectors appears.
Enter data as required.
Choose
.The system updates the preliminary cost estimate in accordance with the data you entered in the selection screen.
The reporting point backflushes of the current period are converted.
See also:
For detailed information on conversion with changes reporting point structures, see the following section:
For general information on the preliminary costing for product cost collectors, see the following section: