Show TOC

 Performing Template Allocation Locate this document in the navigation structure

Prerequisites

You have performed the following steps in Customizing for Product Cost by Order , Product Cost by Period , Product Cost by Sales Order , or Costs for Intangible Goods and Services :

  • Maintain environments and function trees (only if necessary)

  • Maintain template

  • Assign template

Procedure

  1. Choose   Accounting   Controlling   Product Cost Controlling   and then the desired application component (such as Product Cost by Order ), then   Period-End Closing   Single Functions   Template Allocation   Individual Processing   or Collective Processing .

  2. The screen Actual Template Allocation appears.

  3. Enter the required data.

  4. Set the indicators for processing control as desired.

  5. Choose   Allocation   Execute   .  

Result

The system executes the template allocation, and charges the cost object with the product of the template quantity times the activity price.

See also:

For information on the required settings in Customizing, see the Implementation Guide (IMG) for Product Cost Controlling .

For information on process cost allocation, see the document Activity-Based Costing (CO-OM-ABC).