Forecast values indicate the future consumption for a material within a certain period.
Forecast values are usually determined by the system in forecasting and updated in the material master record. However, you can enter forecast values manually for the following purposes:
As a basis for material requirements planning
To correct the forecast values calculated by the system
This is necessary, for example:
If less is to be produced because of the run-up to the company holidays
If higher consumption is expected due to an imminent advertising campaign