You can use this process to set up collection of distributed work times by user in the POD on Labor Off
.
In Standard Value Key Maintenance
, you define standard value key activities to be used later for collecting distributed times (see Standard Value Key Maintenance).
In Scheduling Standards Maintenance
, you assign these fields to a routing step at which users need to collect their distributed work times (see Scheduling Standard Maintenance).
In POD Maintenance
, you create a button associated with the Labor Off
activity (LT380
) and assign it to the layout (see Adding
POD Button Activities to Your PODs and Collect Work Time).
Note
Distributed labor times that have been collected in this activity can be reviewed and edited in the Supervisor Time Edit and Approval
activity after labor rollup has run (see User
Time Edit: User Mode).