This function enables the transfer of production order data from SAP ERP to SAP ME to create or update the corresponding Production
shop order record in SAP ME (see Shop Order).
This function supports long material numbers (see Transfer of Long Material Number).
The production order is used by production planning in SAP ERP to define which material is to be processed, at which location, and at what time, and how much work is required. It also defines which resources are to be used and how the order costs are to be settled.
Release of the Production
shop order in SAP ME triggers production on the shop floor (see Shop Order Release).
You have transferred the material master records for the produced material and all the components (see Material Transfer).
You have created a BOM and a routing for the produced material (see Steps in Creating a Simple Material BOM and Creating a Routing).
You have created a production order either manually or automatically by converting a planned order (see Creating a Production Order).
You have set up ALE communication to create and transmit LOIPRO
IDocs (see Customizing for ALE for Communication with SAP ME).
You have also defined Data Replication Framework (DRF) replication model to replicate LOIPRO0
IDocs (in Customizing for Production
, choose ). For information about SAP ERP versions supporting DRF, see SAP Note 1793291.
Note
LOIPRO03
is required if routings are transferred from SAP ME to SAP ERP (see Transfer of Routing from SAP ME to SAP ERP and the document attached to SAP Note 1793291).
You have defined unique ISO codes for every unit of measure.
You have verified system rule settings (see ERP Integration Rules and SAP ME Configuration for SAP ME ERP Integration).
You have verified settings in ERP Field Maintenance
(see ERP Field Maintenance).
You have optionally imported BOM and routing master data from SAP ERP (see Transfer of Bill of Material (BOM) and Transfer of Routing).
BOM and routing masters that are sent from SAP ERP to SAP ME prior to the production order download allow additional manual configurations to take place inside of SAP ME. This prerequisite is optional because the BOM and routing master can be created in SAP ME directly from the production order download.
You have optionally set up default values for new material, BOM, and routing master data imported from SAP ERP in Default Value Maintenance
(see Material Table, BOM Table, and Routing Table). This is a prerequisite only if your business process requires it, otherwise it can be skipped.
When you create a production order either manually or by converting a planned order automatically or update the production order in SAP ERP and send it to SAP ME, SAPMEINT creates or updates the corresponding Production
shop order record in SAP ME.
Transfer of Production Order: Integration Details
Transfer of Production Order with BOM and Routing
Transfer of Production Order with Quality Inspection Lot
Transfer of Production Order with SFDM Scheduling Information
Transfer of Production Order with Operation-Level Scheduling