You use this activity to view the list of all the components defined in the BOM which then will be filtered to the current or selected operations for the selected SFC number in the POD.
You have created a BOM with the components to be assembled at routing steps in BOM Maintenance.
The following table describes rules and settings that you can change for this activity in Activity Maintenance
:
Rule | Setting |
---|---|
|
|
|
|
The following table describes fields requiring explanation:
Field | Description |
---|---|
| The operation and step ID where operators or machines assemble this component into its parent assembly. |
| The assembly order of this material (see Assembly Point (Assemble Components)). |
| The component (and its version) you are to assemble on to the selected parent SFC number |
| The total number of this component required for each of the selected parent SFC numbers |
| The remaining number of this component to be assembled for each of the selected parent SFC numbers |