You use this report to obtain information about the percentage of time a resource was utilized over the selected date range. The report provides the percentage of time the resource was in each resource state. You can place the cursor over the pie chart to view the actual percentage value.
The search parameters for the report include the following:
Resource
Date range
The chart shows the percentage for each of the following resource states:
Unknown
Productive
Standby
Engineering
Enabled
Disabled
Hold
Scheduled down
Unscheduled down
Nonscheduled
Hold consecutive NC
Hold SPC violation
Hold SPC warning
Hold yield rate
The chart is only displayed in a graphical view.
For more information, see SAP ME Objects.