You use this activity to create and edit a sample plan, which is used to define sampling process settings (see Sampling).
You have created a Sample
routing in Routing Maintenance
(see Routing Maintenance).
The following tables describe fields requiring explanation:
Field |
Description |
---|---|
|
The type of sample standard that will be used for the sample plan
For more information, see Sample Plan. |
|
Unique identifier of the sample plan |
|
The current status of the sample plan
The following statuses are not applicable to the
|
|
The routing to which the sample SFC numbers are sent and to which a rejected sample group is automatically moved (see Routing Maintenance) |
|
The message type sent to the user when the sample plan is rejected during production |
|
The value with which total NC code severity is compared (see NC Code Maintenance) The severities of all NC codes logged for the specific sample SFC number are summarized and the total is checked against the |
|
If checked, SFC numbers with different materials can be added to the same SFC group |
|
If checked, SFC numbers that are on an Note that if this checkbox is checked, the |
|
If checked, the SFC groups only include production SFC numbers that are in queue or in work at the step for the first time. RMA SFC numbers are excluded from sampling and are automatically completed If left unchecked, all SFC numbers will be included in the SFC group, regardless of the times they have been processed at this step. Note that if this checkbox is checked, the |
|
If selected, allows the user to skip sampling of the group during the manufacturing process. |
|
The message type sent when sampling of the SFC group is skipped during production |
Field |
Description |
---|---|
|
The total quantity of SFC numbers (total number of pieces) in sampling group. In case of serialized SFC numbers, this size equals the quantity of SFC numbers in the group. |
|
Determines the relationship between the SFC group size and the sample size for sample plans of the
Note that this field is cleared and disabled if the type of sample plan is |
|
An The values are letters from Note The values are displayed only if you specify both the This field is cleared and disabled if the type of sample plan is End of the note. |
|
The type of inspection procedure during sampling for sample plans of the type
Note that this field is cleared and disabled if the type of sample plan is |
|
The message type displayed to the user when the inspection procedure value is changed to Note that this field is cleared and disabled if the type of sample plan is |
|
The message type displayed to the user when the inspection procedure value is changed Note that this field is cleared and disabled if the type of sample plan is |
|
Refers to the quality limit of satisfactory process average. Used by the system to determine the accept and reject numbers for Note that this field is cleared and disabled if the type of sample plan is |
|
The largest number of failed sample pieces permitted for the sample to be accepted during runtime |
|
The smallest number of failed sample pieces for the sample to be rejected during runtime |
|
Indicates whether the sample size shall be defined by a number or by the percentage of Note that this field is cleared and disabled if the type of sample plan is |
|
The total SFC quantity to be selected for sampling from the SFC group For example, if the Note that the Note that this field is cleared and disabled if the type of sample plan is |
|
The percentage of the total SFC quantity to be sampled from each group For example, if the Must be a positive number less than or equal to |
Field |
Description |
---|---|
|
The material group that the sample plan is attached to |
|
The material that the sample plan is attached to |
|
The operation where the sample plan is executed To assure that different users can process the sample, define the resource for this operation as a process resource. Note You cannot attach sample plan to the operation in the following cases:
End of the note. |
|
A specific resource where the sample plan is executed for the operation |