On the Engineering Change Order
initial screen, fill in the required fields for the ECO.
If you want to place all SFC numbers for a material, process lot, or shop order on hold, select Hold SFCs
on the Main
tab page.
If you want to define specific changes to a product on the shop floor, then, on the Action Groups
tab page, choose Edit
, and then Insert New
.
On the Action Group Details
screen, choose Insert New
and specify the details and actions belonging to this action group.
Apply the details and actions entered for this action group.
Save the ECO record. The status of the ECO changes to Pending
.
If you want to initiate the ECO, choose Activate ECO
. The system opens the SFC Association List
screen.
On the SFC Association List
screen, select the SFC numbers you want changed by the ECO, and choose OK
.
The system performs the following actions:
Changes the status of ECO to Active
Captures SFC numbers at the specified routing and operation
Removes SFC numbers previously placed on hold from a hold state
Sets the date of the ECO in the Actual Start
field