Show TOC

Background documentationConfigure Parallelization for Update

 

Within the process step update data is updated by the system using BRF+ rules.

For more information, see Define Rules Using the Business Rule Framework plus.

For the process step update you can configure the number of parallel processes to improve the performance of the consolidation process.

Prerequisites

To use parallelization in SAP MDG, consolidation you have to set up an RFC destination:

  • To create the bgRFC inbound destination manually, the authorization object S_BGRFC with activity 02 and type 07 has to be assigned to you.

    1. Run transaction SBGRFCCONF.

    2. On the Define Inbound Dest. tab choose Create.

    3. Enter a name in the Destination field.

    4. Enter MDC_QUEUE_ in the Prefixes field.

      If you use a queue prefix other than MDC_QUEUE_ this has to be entered in the corresponding field as described below.

    5. On the Scheduler: Destination tab select the destination by double clicking on it.

      If the destination does not exists, proceed as described:

      1. Choose Create and on the bgRFC Configuration dialog box select Inbound.

      2. Enter the destination name into the Destination field and leave all other values as defaulted.

    6. In the Open Connections field enter the number of allowed parallel processes or queues you wish to be managed by this destination. This number also specifies the maximum of parallel processes to be configured during the step configuration.

  • If you do not create the bgRFC inbound destination manually the very first consolidation process will trigger the automatic creation of the inbound destination under prerequisite that the authorization object S_BGRFC with full authorization is assigned to workflow system user.

For more information see http://help.sap.com/saphelp_nw70ehp2/helpdata/de/f0/225c3c60065627e10000000a114084/content.htmInformation published on SAP site

Activities

To configure the parallelization for the process step update run the Customizing activity under Start of the navigation path Master Data Governance Next navigation step Consolidation and Mass Processing Next navigation step Configure Parallelization for Update End of the navigation path.

  • Choose New Entries.

  • Enter a Configuration ID and the corresponding description.

  • In the Number of Processes field enter the number of processes you want to be processed in parallel.

  • Enter the Prefix of the Queue Name.