The process template you use to create a consolidation or mass process specifies whether and in what configuration certain process steps are executed and in which order the steps apply. The setup of process templates is tied to certain rules concerning the order and recurrence of the individual process steps.
Process step | Recurrence | Order | Used by Consolidation | Used by Mass Processing |
---|---|---|---|---|
No limitation | x | x | ||
No limitation | x | x | ||
Once | x | |||
Once | After Matching | x | ||
No limitation | x | x | ||
No limitation | After
| x | x | |
Mandatory for Replication End of the note. | Once | Last or last but one | x | x |
Replication | Once | Last | x | x |
To specify the Process Template run the Customizing activity under
.Create Process Template
Choose New Entries
.
Enter a Process Template ID
, a corresponding Description, select the Business Object Type
(147
Business Partner
, MDC_147
Business Partner for Consolidation
, or 194
Material
), and the Workflow Template
WS54500001
.
In the Process Goal
field, use the input help to select either Consolidation
or Central Maintenance
.
Note
If you select the Process Goal
Consolidation
records can be loaded repeatedly to be consolidated. The records are not replicated to the source systems.
If you select the Process Goal
Central Maintenance
, records are loaded only once in the hub system. After being consolidated the records are replicated to the source systems. You can use SAP MDG, central governance
to perform the central maintenance.
If you select the process goal Mass Update
, a selection of active records is updated. The process steps matching
and best record calculation
are not supported.
The Delete Source
indicator enables you to configure a default value for the UI. If you want as default value on the UI that source data is deleted after finalizing the process as set the flag Delete.
Save your entries.
Configure Process Template
Mark a process template and choose Process Template Step
Select New Entries
.
Enter a Step Number
.
Select a Step Type
using the input help.
Select a corresponding Adapter
using the input help.
Select a corresponding Configuration ID
.
If you want the process to stop to review the data after finalizing this process step set the Check Point active
indicator.
In case you have set the Check Point
indicator, choose one of the following options using the input help:
No action control
: The process can be continued by a user assigned to a role with the required authorization.
Apply the four-eyes-principle
: The process can be continued by a user assigned to a role with the required authorization except the requestor.
Action is only allowed for requestor
: The process can exclusively be continued by the requestor.
Note
The users have to be assigned to roles that contain the authorization object MDC_PROOT
:
The activity 31
Confirm
has to be assigned to continue processes.
The activity 37
Accept
has to be assigned to continue processes despite unfinished match reviews.
For information on how to adapt the settings within a running process, see Adapt Process Template Configuration Within Process.