Start of Content Area
asynchronous goods movement (IS-A-PPC)

Production Backflush (IS-A-PPC)

Goods movement or production activity that is not posted immediately on transferring the backflushing data from the SCM system to the ERP system (synchronous goods movement). Instead, the data is initially recorded in a buffer on the database. Processing and posting the data is triggered later by a report.

You must not set the indicator "synchronous posting GI" in the SCM product master for materials whose goods movements are not to be posted immediately.

Goods issues are always posted immediately irrespective of the indicator in the product master.

End of Content Area