Start of Content Area
aggregation horizon (SCM-APO-SNP)

Supply Network Planning (SNP) (SCM-APO-SNP)

Time period during which aggregation is carried out as part of aggregated planning; that is, the period during which the orders are read on the level of the sub location product, and created on the level of the header location product.

End of Content Area