automatic reorder point planning (PP-MRP)

Material Requirements Planning (PP-MRP)

A procedure in consumption-based planning.

If available stock is below the reorder point, an entry is made in the MRP file indicating that the material must be included in the next planning run. During the next planning run a procurement proposal is created.

The reorder point and the safety stock level are automatically determined by the forecast program.