Start of Content Area
additive cost estimate (CO-PC)

Product Cost Controlling (CO-PC)

A material cost estimate in which you can enter costs manually in the form of a unit cost estimate, so that the manual costs can be added to an automatic cost estimate with quantity structure.

End of Content Area