Start of Content Area

Procedure documentationDefining an Initial Position  Locate the document in its SAP Library structure

Use

If you use a certain evaluation or several evaluations on a regular basis, you can save the tree structure or the initial position you created for the structure.

Procedure

  1. Call up the tree structure so that you reach the level you require most frequently.
  2. Save the initial position you have chosen by selecting Settings Define initial position.

Result

The section of the tree structure you displayed is saved as the initial position and is displayed next time you call up the report selection.

Further Information

You can delete the created structure under Settings Reset initial position.