Process Chain: Initial Data Loading (Init)
Technical name: 0MMPUR_DLV_INIT_P01
This process chain activates and for the first time fills all data targets for the scenario Delivery Service Purchasing (InfoArea 0MMPUR_DLV, display component Process Chains Delivery Service MM (0MM_DLV)).
With this process chain, the initial data set is updated (initialization of the delta process) in the data targets affected (InfoArea 0MMPUR_DLV).
The data loading processes and the associated activation of ODS objects can be scheduled in one step and monitored centrally in the log view. Individual scheduling and monitoring of InfoPackages and InfoPackageGroups do not apply, nor do activation of ODS objects and subsequent further posting in the data targets.
Step |
Process Type |
Successor |
1 |
Start process Initial Data Loading |
2 |
2 |
Load data InfoPackage 2LIS_02_HDR_INIT_R3 |
If successful, 9 |
2 |
Load data InfoPackage 2LIS_02_SCL_INIT_R3 |
If successful, 4 |
2 |
Load data InfoPackage 2LIS_02_CGR_INIT_R3 |
If successful, 3 |
2 |
Load data InfoPackage 2LIS_02_ITM_INIT_R3 |
If successful, 3 |
2 |
Load data InfoPackage 2LIS_02_SCN_INIT_R3 |
If successful, 3 |
3 |
AND (final) AND1 |
7 |
4 |
Load data InfoPackage 2LIS_02_SGR_INIT_R3 |
If successful, 3 If successful, 5 |
5 |
Activate ODS data 0PUR_DS03 |
If successful, 6 |
6 |
Load data InfoPackage 80PUR_DS03_FULL_DATAMART |
- |
7 |
Activate ODS data 0PUR_O01 |
If successful, 8 |
8 |
Load data InfoPackage 80PUR_O01_INIT_DATAMART |
If successful, 9 |
9 |
AND (final) AND2 |
10 |
10 |
Activate ODS data 0PUR_O02 |
If successful, 11 |
12 |
Load data InfoPackage 80PUR_O02_INIT_DATAMART |
- |
This process chain has the following scheduling options:
· Delivered scheduling option: planned start: January 1, 2003 – 12:00 a.m.
· Variant setting for the start process: direct scheduling
Beware of the following points during the transfer of the Business Content:
...
1. If you are using an SAP source system:
a. During the transfer, collect the process chain 0MMPUR_DLV_INIT_P01 as usual with the necessary objects (or, where applicable, data flow before and/or after).
b. Beforehand, when assigning the source system, select the affected SAP source system and the SAP BW application component itself.
c. Transfer the collected objects.
2. If you are using more than one SAP source system (with identical SAP DataSources):
a. During the transfer, collect the process chain 0MMPUR_DLV_INIT_P01 as usual with the necessary objects (or, where applicable, data flow before and/or after).
b. Beforehand, when assigning the source system, select the affected SAP source systems and the SAP BW application component itself.
c. Transfer the collected objects.
Following the transfer of the process chain, the following postprocesses are required:
...
1. In the transaction Process Chains (RSPC), select your transferred process chain.
2. If you selected more than one SAP source system during the transfer, remove the link between the processes of type Load Data and the successors. Process only those processes that have InfoPackages with identical InfoSources. Then add, for example, the process type AND and toggle this connection between the just-removed link.
3. Following the start process, several data loading processes from the SAP R/3 system are triggered in parallel. Check whether there are enough processes available in the source system. If necessary, modify the link to a sequential one.
4. Adjust the scheduling options of your start process to your requirements. To do this, double click on the process type Start.
5. If required, enhance the process chain with further processes, e.g. the setup of indices or the compression of InfoCubes.
6. Then save, check and activate the process chain and provide information, where applicable, about which server the process chain should be scheduled on. Then use the function Activate and Schedule to start the process chain according to your scheduling options.
Following the successful run of this process chain, you can transfer the process chain Initial Data Loading (Delta) (0MMPUR_DLV_DELTA_P02) and, where applicable, adjust/enhance and activate/schedule it.
The process chain supports SAP R/3 standard systems as of Release 4.5B.