Amount (Controlling Area Currency)
Technical name: 0AMOCAC
Use
In cost center planning with SEM-BPS it is desired to make the planned amounts available parallel both in the
object currency of the respective cost center and in the currency of the controlling area, since these must not necessarily be identical. This key figure is used to lead the amounts planned in the cost centers into the currency of the controlling area, to which the cost centers belong.Technical Data
|
Available as of release |
3.0 |
|
Unit |
0CURRENCY |
|
Aggregation |
Summation |
|
Exception aggregation |
Summation |
|
Calculation |
no |
|
Constraint |
no |