Show TOC Start of Content Area

Object documentation Current Month Plus Two for Expected Completion Date  Locate the document in its SAP Library structure

Technical name: 0I_MP2EX

 

Use

This variable delivers the interval of the second month from the current month. It provides a range of values from the first day of the month to the end of the second month from current.

 

Integration

This variable is used with the Expected Completion Date of an Opportunity characteristic (technical name: 0CRM_EXPEND).

 

End of Content Area