Show TOC

 Simultaneous Teardown and Wait

Use

Using the Parallel teardown/wait indicator on the Interoperation times tab page of the operation you can control whether the wait time and teardown time are to be scheduled as simultaneous or consecutive operation segments. The parallel positioning of teardown time and wait time reduces the lead time of the operation.