Show TOC

 Creating a Document Link

  1. Choose Start of the navigation path Logistics Next navigation step Production Next navigation step Shop floor control Next navigation step Order Next navigation step Change Next navigation step . End of the navigation path

  2. Enter the order number.

  3. Choose .

  4. The document overview appears.

  5. Enter the data for the new document link ( sequence , operation , document type , document , document version , subdocument ).

  6. You can assign the document to the order header (no entries in the Sequence and Operation fields) or to an operation.

  7. Choose .