You make the following settings for document integration in the production order:
Customizing for
Document Management
In Customizing for
Define object link
. Enter PORDER and
Screen number
251.
If you do not make this setting, the documents in question are ignored during the automatic generation of the document link . When you attempt to manually create the link, the system issues an error message and refuses to create it.
Production scheduling profile
In the production scheduling profile, (Customizing for
Shop Floor Control
by choosing
) you can define that when an order is created or released, document links from the material master of the produced material or document items from the BOM are copied as document links into the production order.