 Priorities for Automatic Routing Selection: Example

In Customizing, the following priorities are assigned for plant 0001 and order type PP01 :

Priorities for Routing Selection

Task list type

Use

Status

1. N

Electronics

Released

2. N

Electronics

Created

3. N

Production

Created

In this case the system first looks for a routing with the usage electronics and the status released. If it does not find a routing that fulfills these criteria it looks for a routing with the usage electronics and the status created. If it does not find a routing that fulfills these criteria it looks for a routing with the usage production and the status created.

If, in spite of these priorities, it is not possible to select a routing, the system reads all the routings that exist for the material at the explosion date that should be selected according to the selection ID. You must then choose a routing manually from this list.