Show TOC

 Maintaining an Individual Operation

Prerequisites

You can make changes to the order data both in create and in change mode.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Production Next navigation step Shop Floor Control Next navigation step Order Next navigation step Change Next navigation step . End of the navigation path

  1. Specify the number of the order that you want to change.

  1. Choose .

The initial screen for production orders appears.

  1. Choose .

  2. Select one or more operations.

  3. The operation data is divided into two sections that you can access in different ways.

To go to the tab pages , first choose and then one of the following tab pages:

  • General

  • StandardVals

  • Ext. processing

  • Interop. times

  • Std value determin.

  • Splitting

  • Overlapping

  • Dates

  • User Fields

  • SO delta

  • Qty/activities (display-only fields)

  • Confirmed dates (display-only fields)

  • Assignment of reqmts

  • Qualificats

  • Long text:

Note Note

For each plant and order type, you can define your own layout of the tab pages for the operations (Customizing for Shop Floor Control by choosing Start of the navigation path Screen Control Next navigation step Define User-Specific Tab Pages Next navigation step Define Operation Detail Screens End of the navigation path ).

End of the note.

To go to the operation detail screens, choose

  • Start of the navigation path Operation Next navigation step Purchase requisition End of the navigation path

  • Start of the navigation path Operation Next navigation step Object dependency End of the navigation path

  • Start of the navigation path Operation Next navigation step Long text End of the navigation path

  1. Make the necessary changes and save the order.