The operations taken from the routing and scheduled for the order are listed on the operation overview. You can maintain this data here.
The following information is listed for every operation on this screen:
The operation number (this number specifies the sequence in which operations are processed).
The suboperation number of existing suboperations
The work center where the operation is to be executed
The control key that determines how the operation is to be used (for example, whether it must be confirmed, whether it can be scheduled, whether it can be printed, and so on)
The current status of the operation (for example, whether it has already been created or released)
The start and finish date of the operation
A short description of the operation
There are also the COMP, PRT and TPT columns:
If the indicator is set in the
COMP
column, it means that components are assigned to the operation.
If the indicator is set in the
PRT
column, it means that production resources/tools are assigned to the operation.
If the indicator is set in the
TPT
column, it means that trigger points are assigned to the operation.