Maintenance of the status is the most common reason for changing an order. Unless defined otherwise in a profile, the order receives the status CRTD (created) after it has been created. The order cannot be executed until it has been released (status REL).
Other reasons for changing an order are changes to the order header, components or operations. This mostly occurs when an order is to be created for rework, with the current material as the component.
Change documents can be created when an existing production order is changed, provided corresponding settings have been made in Customizing (Customizing for Shop Floor Control, by choosing
Call up the transaction as follows:
Menu path |
|
Transaction code |
CO02 |
You can change the following
order header
data:
General
tab page on the order header
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
Total quantity |
Total quantity of the material to be produced |
R |
Change, if necessary |
|
Scrap portion |
Scrap quantity that occurs during production |
O |
Enter, if required, in the base unit of measure |
The system increases the order by this proportion |
Order finish date |
Date on which the required quantity of the material is available (requirements date) |
D |
Retain, if necessary |
|
Order start date |
Earliest date on which order execution can start |
D |
Retain, if necessary |
|
Scheduling type |
Key which specifies the scheduling type for detailed scheduling (backward, forward and so on) |
R |
Retain, if necessary |
Defines which date is entered by the user and which date is calculated by the system |
Priority |
Priority of an order, for information purposes |
O |
Retain, if necessary |
|
Scheduling margin key |
Key with which the system determines the required floats (opening period, float after production, float before production, release period) |
R |
Retain, if necessary |
Assignment
tab page on the order header
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
MRP controller |
MRP controller for the order |
O |
Retain, if necessary |
|
Production scheduler |
Production scheduler |
O |
Retain, if necessary |
|
WBS element |
Work breakdown structure element |
O |
Retain, if necessary |
|
Profit center |
Profit center |
O |
Retain, if necessary |
|
Sequence number |
Sequence number |
O |
Retain, if necessary |
Used to sort the orders |
Goods receipt
tab page on the order header
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
Stock type |
Stock type |
O |
Retain, if necessary |
|
GR process time |
Processing time for goods receipt in days |
O |
Retain, if necessary |
|
Delivery completed |
Delivery complete indicator |
O |
Retain, if necessary |
Indicates that the item is to be regarded as closed |
Underdelivery |
Tolerance limit for underdelivery |
O |
Retain, if necessary |
|
Overdelivery |
Tolerance limit for overdelivery |
O |
Retain, if necessary |
|
Unlimited overdelivery |
Unlimited overdelivery allowed |
O |
Retain, if necessary |
|
Storage location |
O |
Retain, if necessary |
||
Distribution |
MRP distribution key |
O |
Retain, if necessary |
|
Batch |
Batch number |
O |
Retain, if necessary |
|
Goods recipient |
Goods recipient |
O |
Retain, if necessary |
|
Unloading point |
Unloading point |
O |
Retain, if necessary |
Control
tab page on the order header
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
Res./Purc. req. |
Reservation relevance/generation of purchase requisition |
O |
Retain, if necessary |
|
CstgVariantPlan |
Costing variant for planned costs |
O |
Retain, if necessary |
|
Costing sheet |
Costing sheet |
O |
Retain, if necessary |
|
RA key |
Results analysis key |
O |
Retain, if necessary |
|
Plan cost calc. |
Determines planned costs |
O |
Retain, if necessary |
Controls whether planned costs are automatically calculated when you save a network or a production order |
CstgVariantActl |
Costing variant for actual costs |
O |
Retain, if necessary |
|
Overhead key |
Overhead key |
O |
Retain, if necessary |
|
Variance key |
Variance key |
O |
Retain, if necessary |
|
Calculates capacity requirements |
Calculates capacity requirements |
O |
Retain, if necessary |
|
Exact breaks |
Scheduling allowing for breaks |
O |
Retain, if necessary |
|
Automat. |
Schedule automatically |
O |
Retain, if necessary |
|
Profile |
Production scheduling profile |
O |
Retain, if necessary |
Long text
tab page on the order header
Note
Choose
Functions
to access various functions that you can execute for the order.
Choose
Header
to access various functions that you can execute for the order header.
To reach the
Operation overview
, choose
.
You can change the following operation data:
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
Work ctr |
Work center |
O |
Retain, if necessary |
|
Plant |
Plant |
O |
Retain, if necessary |
|
Ctrl |
Control key |
O |
Retain, if necessary |
Defines which business transactions are permitted |
StdText |
Standard text key |
O |
Retain, if necessary |
Identifies a text frequently used to describe operations (for example, turning or milling) |
Operation short text |
Operation short text |
O |
Retain, if necessary |
|
Sequence number |
Sequence number |
O |
Retain, if necessary |
Used to sort the operations |
Note
You can find more fields that can be changed on the operation tab pages:
General, Standard values, External processing, Interoperation times, Standard value calculation, Splitting, Overlap, Qualification, Long text
. To go there, select the operation and choose
.
Choose
Operation
to access various functions that you can execute for the operation.
To reach the
Component overview
, choose
.
You can change the following component data:
<<< Screen print goes here>>>
Field name |
Description |
R/O/D |
User action and values |
Comments |
Component |
Material number |
O |
Retain, if necessary |
|
Reqmts qty |
Requirements quantity of the component |
O |
Retain, if necessary |
|
UoM |
Base unit of measure |
O |
Retain, if necessary |
Unit of measure in which the material's stock is managed |
Plant |
Plant |
O |
Retain, if necessary |
|
SLoc |
Storage location |
O |
Retain, if necessary |
|
Bf |
Backflush |
O |
Retain, if necessary |
|
SP |
Special stock indicator |
O |
Retain, if necessary |
Note
You can find more fields that can be changed on the component tab pages:
General data, Purchasing data, Variable-size item data, Co-product, Text item, Long text
. To go there, select the component and choose
.
Choose
Component
to access various functions that you can execute for the component.
To save the order, choose
.