Use of Operations
You use operations to describe the individual steps in an order.
You can plan an order at different levels of detail, depending on the type of order involved and the extent of the work being planned:
Short orders containing only one operation (fast entry)
For these orders, you can enter data for a single operation in the lowest section of the header data screen, without having to use any further screens. The operation can involve internal or external processing. You use the operation detail screens for this operation.
Long orders without detailed planning
For these orders, you use the operation overview function. You can use this to enter as many operations as required.
Short or long orders with detailed planning
For these orders, you use the operation overview and the operation detail screens.
Note
If you initially created and saved an order with header data only and no operation, the system automatically creates the first operation for the order header when saving. This is necessary because you need at least one operation to be able to plan, schedule and confirm the order.
The operation created automatically contains the same data as the order header. You can change these if required.
Use of Sub-Operations
If several work centers are to execute an operation, you can divide the operation into sub-operations. You can thereby schedule a different work center for each sub-operation. The operation itself may contain a work center that, for example, coordinates the work centers in the sub-operations.
You create sub-operations in the same way as operations in the Operation Overview
. In addition, you specify the number of the operation, to which they are assigned.
The following options are available for detailed planning of an order at operation level:
Describe the work steps to be performed
Assign work centers
Specifying where the work should be executed (for example, an assembly of the reference object)
Specifying a control key
Assigning required material
Assigning required utilities
Assign personnel
Specifying detail data for internal processing
Specifying detail data for external processing
Specifying scheduling data
Entering qualifications
For more information, see Use of Performing Work Centers in the Operation.
Entering company-specific user data
Deleting operations
If the order has not yet been released, the operations are physically deleted. These operations can no longer be displayed.
If the order has already been released, deletion indicators are assigned to the operations. These operations can still be displayed.
Based on the control key, which you enter in the operation, the system automatically determines which operation detail screen must be completed. To select this detail screen, double click on the operation number.